Springfield Central Train Line Becomes T2 Under New Queensland Numbering System

Springfield Central commuters are getting a new way to identify their train, with the service to Kippa-Ring becoming T2 as South East Queensland rolls out a new train and tram numbering system.


Read: Springfield Commuters Hit Hard as Queensland Rail Cuts Nearly 300 Train Services


The change is being introduced progressively during August 2026. For Springfield passengers, T2 identifies the service running from Springfield Central through Brisbane and north to Kippa-Ring.

Translink says the new numbers will appear alongside destinations on network maps, signage, the journey planner and onboard information. There are no changes to timetables, routes or stopping patterns, with destinations continuing to be displayed alongside the new numbers.

A new label for Springfield’s rail service

Photo credit: Google Maps/Bryce

The T2 route includes Springfield Central, Richlands, Darra, Indooroopilly, Toowong, Brisbane’s CBD, Bowen Hills, Northgate, Petrie, Kallangur, Mango Hill, Rothwell and Kippa-Ring. The numbering gives passengers another way to identify their service, while the destination remains part of the information shown to customers.

Better Transport Queensland strongly supports the change.

“BTQ strongly supports the introduction of train line numbering for SEQ. This is a common practice throughout the world and simply matches what we already do on buses, ferries and trams.”

BTQ president Rowan Gray said line numbering would improve the legibility of the rail network. He pointed to existing service codes that can be difficult to interpret in Google Maps and official journey-planning information, saying the new labels would provide a more straightforward way of identifying services.

Gray also said the numbering should be established well before Cross River Rail opens, allowing passengers to become familiar with the new presentation before the information on the network changes further.

Elizabeth Line question remains

The numbering system also arrives as debate continues over the proposed Elizabeth Line name for Cross River Rail. The LNP has previously proposed renaming Cross River Rail the Elizabeth Line in honour of Queen Elizabeth II. In 2024, the party confirmed it would proceed with the proposed name change if it won that year’s Queensland election.

Cross River Rail is being integrated into the broader rail network, with existing services expected to use the new infrastructure.  For Springfield commuters, T2 provides a practical example of how the new numbered system will identify services.

Rather than relying on a destination alone, passengers will see a line number alongside it. For someone travelling from Springfield Central towards Kippa-Ring, that number will be T2.

What changes for Springfield passengers?

Photo credit: Google Maps/Yamin Shah

For regular commuters, the immediate change is mainly about identification. The train they already use is not getting a new timetable or stopping pattern because of the numbering rollout.

Translink said the system is intended to make the network easier to understand, navigate and use, particularly for visitors and customers with accessibility needs. The numbers will progressively appear across maps, signage, journey-planning information and onboard displays during August.


Read: Queensland Rail to add Extra Train Services to Springfield and other Lines During Peak Times


For Springfield Central passengers, one of the most noticeable results will be a simple new label on a familiar service. The Springfield Central to Kippa-Ring route is now T2, adding another layer of consistency to the way South East Queensland’s rail network is presented.

Published 17-August-2026

Springfield Commuters Hit Hard as Queensland Rail Cuts Nearly 300 Train Services

Queensland Rail has shifted the network to a modified Saturday-style timetable, axing 273 train services and cutting Springfield Line peak frequencies from every six minutes to every 15, with no confirmed end date in sight for commuters travelling between Springfield Central, Springfield, Richlands and Darra.



For Springfield Lakes, Springfield, Richlands and Darra commuters who depend on the Springfield Line to reach the city for work, the cut represents a significant daily disruption with no confirmed end date. Queensland Rail says the reduction is necessary because 42 three-car sets are currently offline awaiting maintenance, leaving 20 per cent of the train fleet unavailable.

“The simple fact of the matter is that we do not have enough trains to run our full timetable,” Queensland Rail head of corporate affairs Nev Conway said.

Behind the service cuts

The timetable cuts, which will take effect on Tuesday 5 May, stem from a maintenance backlog Queensland Rail attributes to rolling industrial action by the Electrical Trades Union (ETU), the Rail Tram and Bus Union (RTBU) and the Australian Manufacturing Workers Union (AMWU), involving 880 notices of industrial action lodged against the network. All three unions are in a wage dispute affecting maintenance workers across the Queensland Rail network.

Photo Credit: Google Maps

The unions dispute that characterisation. The ETU argues that Queensland Rail’s decision to withhold pay from employees for performing partial duties, communicated to workers on Friday morning, is the direct cause of the timetable collapse. The AMWU echoes that position, arguing the disruption stems from poor planning rather than strike action alone.

“The AMWU has made it clear for weeks that industrial action can be withdrawn if agreement is reached on just two key classification-based claims,” an AMWU spokesperson said. “Commuters are paying the price.”

Queensland Rail last week also cut train capacity from six-car to three-car sets before this week’s further reduction in services. The timetable will be cut again if the maintenance backlog continues to grow.

For Springfield Line commuters 

From Tuesday 5 May until further notice, Springfield Line services run every 15 minutes during morning and afternoon peak hours, and every 30 minutes off-peak. Trains will be more crowded due to the simultaneous reduction in service frequency and the use of three-car sets instead of six-car sets. Commuters should expect delays at platforms and allow additional travel time, particularly during peak windows.

Airtrain services remain unaffected by the timetable changes.

Queensland Rail has issued 471 return-to-work notices to its maintenance workforce, with 490 maintenance employees facing loss of pay if they continue to participate in strike action.

Planning your trip this week 

Commuters on the Springfield Line are strongly advised to check the TransLink journey planner before leaving home each day, as live updates to services will continue to be published there. Services may be reduced further if the backlog of maintenance work continues to grow.

The situation is being reviewed against a union response deadline of 7 May. Until an agreement is reached, the reduced timetable will remain in place.

For live service updates, click here or download the TransLink app. Replacement bus services are operating at some stations to manage overflow demand.



Published 4-May-2026

Track Closures Scheduled on Ipswich, Springfield, and Inner City Lines

Starting from the first service on Saturday, 22 December 2018 until the last service on Saturday, 29 December 2018, there will be track closures on the Ipswich, Springfield, and Inner City lines.

Railbuses will be replacing trains between the affected stations so commuters can plan their journey in advance. Timetables will also be available to inform commuters about the schedule of the arrival times.

Take note that normal services will resume from the first service on Sunday, 30 December 2018.

Plan Your Journey

Check if the closures will affect your journey. Following are the dates and the lines that are part of the closure:

Ipswich and Springfield line track closure
Saturday, 22 December to Monday, 24 December 2018

Photo credit: TransLink

Railbus timetables and stop locations.


Ipswich, Springfield and Inner City line track closure
Tuesday, 25 December to Wednesday, 26 December 2018

Photo credit: TransLink

Railbus timetables and stop locations.


Ipswich and Springfield line track closure
Thursday, 27 December to Friday, 28 December 2018

Photo credit: TransLink

Railbus timetables and stop locations.


Ipswich, Springfield and Inner City line track closures
Saturday, 29 December 2018

Photo credit: TransLink

If your journey will be affected by the closures, make sure to plan in advance and allow time to transfer between bus and train services. Check TransLink’s Journey Planner for further information.

Railbus timetables and stop locations.



Improvement Works

Photo credit: Queensland Rail

Track closures are part of the improvement works on Queensland Rail’s network. Train signals between Roma Street and Corinda stations will be upgraded and new track crossovers will be installed near the Milton station.

The benefits of these upgrades include:

  • replacement of old signals infrastructure, some of which is over 50 years old
  • integration of signals with new, sophisticated train control systems
  • installation of new track crossovers, eliminating congestion and potential delays.

To know more about the improvement project, visit the Queensland Rail website.